WORLDS FIRST DOWNHILL LONGBOARDING PARK!!!



BAGGS posted,

THANKS TO ALL OF YOU COAST LONGBOARDING IS PULLING IN ABOUT 20,000,000 HITS/YEAR. OVER 25,000,000 HITS JUST IN 2009. IF ALL THOSE PEOPLE PAID 10 CENTS YOU WOULD HAVE 2 MILLION BUCKS IN ONE YEAR FOR A LONGBOARD PARK. IF HALF THOSE PEOPLE STOPPED VISITING THE SITE YOU WOULD HAVE IT IN 2 YRS AND SO ON. EITHER WAY 2-3 MILLION BUCKS COULD EASILY KICK START A SERIOUS DOWNHILL LONGBOARD PARK WITH A TOW ROPE THEN EVENTUALLY A CHAIR LIFT. 1 LONG, CURVY, STEEP, STRAIGHT RUN WITH BANKING CORNERS. CERTIFIED FIRST AID WORKER ON SITE DURING ALL BUSINESS HOURS. WITH THESE KIND OF NUMBERS IT WOULDNT TAKE LONG. YOUD PROBABLY HAVE MONEY LEFT OVER TO BUY AN OLD STREET SWEEPER TO KEEP THE RUN SPOTLESS. THEN IN TIME EXTRA PROCEEDS FROM THE SITE WOULD GO TO ADDING RUNS AND CHAIR LIFTS. JUST A THOUGHT? I KNOW I PERSONALLY WOULD HAVE NO TROUBLE PAYING 10-20 BUCKS A MONTH TO VISIT THIS SITE 1-200 TIMES. AND SINCE YOU'D HAVE TO LOG IN BRICE COULD ADD A FEATURE THAT SHOWS WHO ELSE IS ONLINE WITH A CHAT OPTION ASWELL. OF COURSE FACEBOOK HAS THAT BUT THEY WONT EVER PROMISE YOU ANYTHING LET ALONE A BAD ASS LONGBOARD PARK YOU CAN SAY YOU PERSONALLY HELPED PAY FOR. TOTALLY SOMETHING WORTH CONTRIBUTING TO IN MY EYES. BUT ENOUGH YAMMERING MY POINT IS....




WHAT DO YOU THINK OF THIS IDEA?

2010 January 27 5:27 PM


first time blanky,long time reader replied,

put up or shut up logic?

2010 January 27 5:55 PM


Max from NZ replied,

good idea. i was going to retire like
this. buy a farm and pave roads around
the farms and have lifts to the top of
each run with each run having different
runs.

but this will be in like 20 years lol

and nz already has a downhill park :P

2010 January 27 6:57 PM


Dusty replied,

rad, never realized bukolik had a webpage. founds some photos i never knew existed. its a freeride, roads not closed all year.i was there.
they had lights running down the track for night riding which was pretty awesome. "old school" cable cart going up the side of the track so the road is closed for cars during the freeride (2days 2nights riding)

2010 January 28 8:13 AM


blankeng replied,

after all the geotech work needed to design a hill that will work, your looking at 1/2 mil at least, not including construction costs. Unless you want like a sweet 100m long section.

2010 January 28 3:13 PM